As pioneers in bridge and highway engineering across the nation, we take great pride in our work. Our expertise and experience has allowed us to design and execute some of the most challenging projects, including the first of its kind in superstructures and substructures across extremely critical conditions. Check out our recent projects to learn more about our capabilities and experience.
ONGOING PROJECTS

Multi level Grade Seperator at Gachibowli Junction (Shilpa Layout)
Location : Hyderabad,Telangana
Client: GHMC, Telangana
Construction Agency: M. Venkata Rao. Infra Projects Pvt. Ltd. Hyderabad, India.
Total Length of Flyover – 2805 m
Span Configuration - 3 to 4 span continuous girders of
30 m generally.
Salient Features : 35+50+35m obligatory span steel composite spans
Designed for heavy radius of curvature
Contains Slip road on both sides along the Flyover
65m Curved steel composite superstructure.
4 lane Flyover at Nalgonda cross roads
Location : Hyderabad,Telangana
Client: GHMC, Telangana
Construction Agency: M. Venkata Rao. Infra Projects Pvt. Ltd. Hyderabad, India.
Total Length of Flyover – 2500 m
Span Configuration - 3 to 4 span continuous girders of 30 m
​
Salient Features :
Pier & Piercap are designed in Steel
Superstructure is designed as Steel composite I girders.

COMPLETED PROJECTS

4 Lane Multi Level Flyover RTC Cross Roads
Location : Hyderabad,Telangana
Client: GHMC, Telangana
Construction Agency: M. Venkata Rao. Infra Projects Pvt. Ltd. Hyderabad, India.
Total Length of Flyover – 2000 m
Span Configuration - 3 to 4 span continuous girders of 30 m generally.
Salient Features :
Pier & Piercap are designed in Steel
Superstructure is designed as Steel composite I girders.
6 Lane Flyover on Old Mumbai Highway
Location : Hyderabad,Telangana
Client: GHMC, Telangana
Construction Agency: M. Venkata Rao. Infra Projects Pvt. Ltd. Hyderabad, India.
Construction Cost: Rs. 220 Crores
Total Length of Flyover – 2805 m
​
Salient Features:
•Span Configuration - 3 span/ 4 span continuous girders of 30 m generally.
•35+50+35m obligatory span steel composite spans
•Designed for heavy radius of curvature
•Contains Slip road on both sides along the Flyover

ONGOING PROJECTS

Multi level Grade Seperator at Gachibowli Junction (Shilpa Layout)
Location : Hyderabad,Telangana
Client: GHMC, Telangana
Construction Agency: M. Venkata Rao. Infra Projects Pvt. Ltd. Hyderabad, India.
Total Length of Flyover – 2805 m
Span Configuration - 3 to 4 span continuous girders of
30 m generally.
Salient Features : 35+50+35m obligatory span steel composite spans
Designed for heavy radius of curvature
Contains Slip road on both sides along the Flyover
65m Curved steel composite superstructure.
4 lane Flyover at Nalgonda cross roads
Location : Hyderabad,Telangana
Client: GHMC, Telangana
Construction Agency: M. Venkata Rao. Infra Projects Pvt. Ltd. Hyderabad, India.
Total Length of Flyover – 2500 m
Span Configuration - 3 to 4 span continuous girders of
30 m generally.
Salient Features :
Pier & Piercap are designed in Steel
Superstructure is designed as Steel composite I girders.

COMPLETED PROJECTS

4 Lane Multi Level Flyover RTC Cross Roads
Location : Hyderabad,Telangana
Client: GHMC, Telangana
Construction Agency: M. Venkata Rao. Infra Projects Pvt. Ltd. Hyderabad, India.
Total Length of Flyover – 2000 m
Span Configuration - 3 to 4 span continuous girders of 30 m generally.
​
Salient Features :
Pier & Piercap are designed in Steel
Superstructure is designed as Steel composite I girders.
6 Lane Flyover on Old Mumbai Highway
Location : Hyderabad,Telangana
Client: GHMC, Telangana
Construction Agency: M. Venkata Rao. Infra Projects Pvt. Ltd. Hyderabad, India.
Construction Cost: Rs. 220 Crores
Total Length of Flyover – 2805 m
​
Salient Features:
•Span Configuration - 3 span/ 4 span continuous girders of 30 m generally.
•35+50+35m obligatory span steel composite spans
•Designed for heavy radius of curvature
•Contains Slip road on both sides along the Flyover


MARTHANDHAM STEEL FLYOVER
Location : Marthandam, Tamil Nadu
​
Client: Ministry of Road Transport & Highways
Construction Agency: SPL Infrastructure Pvt. Ltd., Chennai
Scope: Proof & Value Engineering consultants
Total Length of Flyover – 2808 m
​
Salient Features:
•Span Configuration - simply supported, various spans ranging from 20m to 50m
•Steel Pier & Pier cap supported over Pile caps
•Steel superstructure with concrete deck slab
PARVATHIPURAM STEEL FLYOVER
Location : Nagarcoil,Tamilnadu
Client: Ministry of Road Transport & Highways
Construction Agency: SPL Infrastructure Pvt. Ltd., Chennai
Scope: Proof & Value Engineering consultants
Total Length of Flyover – 1534 m
Span Configuration - simply supported, various spans ranging from 20m to 50m
​
Salient Features:
•Steel Pier & Piercap supported over Pilecaps
•Steel superstructure with concrete deck slab


4 Lane Flyover on Road No. 45, Hyderabad
Location : Hyderabad,Telangana
Client: GHMC, Telangana
Construction Agency: M. Venkata Rao. Infra Projects Pvt. Ltd. Hyderabad, India
Construction Cost: Rs. 80 Crores
•Total Length of Flyover – 1770 m
•Span Configuration - 3 to 4 span continuous girders of 30 m
Salient Features:
•4x 30m obligatory span steel composite spans
•Designed for heavy radius of curvature
•Contains Slip road on both sides along the flyover
TRANS ARUNACHAL HIGHWAY - Potin Pangin Highway Private Limited
Location : Arunachal Pradesh
Client: GHMC, Telangana
Construction Agency: M. Venkata Rao. Infra Projects Pvt. Ltd. Hyderabad, India
Construction Cost: Rs. 220 Crores
Total Length of Flyover – 2805 m
​
Salient Features:
•Widening of existing road to 2 lane NH standards along with improvements and re-alignments from potin to pangin in Arunachal Pradesh on NH-229 on DBFOT Annuity basis.
•Scope of work : Design of all structures consisting of 5 major bridges, 50 minor bridges, 2500 culverts and retaining walls/Breast walls.


Flyover at Kalina and Vakola Junctions, Bombay, India
Location : Mumbai,Maharashtra
Client : Maharashtra State Road Development Corp.
Construction Agency: Nagarjuna Construction Company Limited - ECCI Limited Joint Venture, Hyderabad, India.
Construction Cost: Rs. 42 Crore
​
Salient Features:
This is a six-lane flyover of length 1427.00 meters and width 24.20 meters. The length of the viaduct portion of the flyover is 1127.00 meters comprising of 400 numbers of post-tensioned I-girders and having 50 spans (ten five-span continuous segments) of 20 meters each and two two-span cast-in-situ prestressed concrete continuous box girders spanning 44.00 - 27.00 meters at Kalina and Vakola junctions.
We submitted the designs and drawings in a phased manner enabling the contractor to complete the project three months ahead of schedule.
Elevated Bangalore - Hosur Expressway on NH- (Between Silk Board
Junction to Electronic city)
Location : Bengaluru, Karnataka

Client: This is a BOT project for a consortium of contractors comprising of M/s.Nagarjuna Constructions, Maytas Infra and SOMA enterprises.
Cost : 450 Crores
​
Salient Features:
The Scope of the Project is as given below:
• Construction of 4 Lane Elevated Corridor with Precast Segmental construction from • Km 9.681 to Km 17.735 (8.045 Km)
Widening of the existing main carriageway from 4 Lane to 6 Lane standards.
•Widening of Service road to 2 Lane with 2.5 m shoulder.
• Construction of approach Ramps with Reinforced earth wall of width 16.4 m from Km 9.509 to Km 9.681 with maximum height of 8 mts.
•Construction of RCC Drain on both side of the carriageway
• Construction of Interchange at Electronic City consisting of RCC curved voided slabs and Precast girders with in-situ deck slab.
• Widening of existing cross drainage structures.
• Construction of Pedestrian subways at four locations with Box pushing method.

HLB ACROSS GODAVARI RIVER CONNECTING KARIMNAGAR AND ADILABAD DISTRICT
Location : Karimnagar,Telangana
Client: GHMC, Telangana
Construction Agency: M. Venkata Rao. Infra Projects Pvt. Ltd. Hyderabad, India
Construction Cost: Rs. 80 Crores
•Total Length of Flyover – 1770 m
•Span Configuration - 3 span/ 4 span continuous girders of 30 m generally.
​
Salient Features:
Total length of bridge is 1000mts including approaches consisting of 1 span of 65 mts PSC box girder , 2 spans of 35 mts PSC I – section girders and rest of spans typical 25mts PSC girders.
Flyover Cum ROB , Subway and Allied works, Latur India
Location : Latur,Maharashtra

Client: Maharashtra State Road Development Corp
Construction Agency: Nagarjuna Construction Company Limited .
Construction Cost: Rs. 18 Crores
​
Salient Features:
The flyover is of 460 m length including 1 Nos. of Obligatory span twin cell cast in situ curved PSC box girder of span 37.0m Viaduct spans consists of 3 span continuous twin cell PSC box girder catering to 3 lane carriageway of 11.0 m width. The substructure consists of single pier with a cantilever pier cap and open foundations.
This project also consists of a 100 m length closed subway with 200 m open subway on either side in effect giving rise to a three level interchange at the junction.

Flyover at Greenlands Junction
Location : Hyderabad,Telangana
Client: Greater Hyderabad Municipal Corporation, India
Construction Agency: JMC Projects (India) Pvt Ltd .
Construction Cost: Rs. 19 Crores
​
Salient Features:
The total length of the flyover is around 870 m length including 1 Nos. of Obligatory span single cell cast in situ curved PSC box girder of span 40.0m Viaduct spans consists of 3/4 span continuous precast PSC girders with in situ deck slab
Design and Construction of NH7 between Km 207.050 (Salem) to Km
248.625
Location : Salem, Tamilnadu

Client : BOT project for M/s. M .V.R. Infrastructure and Tollways Pvt. Ltd
​
Salient Features:
The construction package for the project includes developing the existing two lane carriageway to four I six lane divided carriageway standards.
The entire stretch of the projects include 4 Nos. Flyovers, 1 Nos.. Road over bridge, 14 Nos. Minor bridges, 48 Nos. CD structures and 8 Nos. Pedestrian
underpass. Construction of Ramps with Reinforced earth wall of maximum height of 8 mts
Experience Matters: A History of Achievements

Completed Projects – FLYOVERS/ BRIDGES
CONSTRUCTION OF GRADE SEPERATOR AT DABOLIM AIRPORT, GOA
Design of 1.6 kilometer grade separator with a varying radius ranging from 30m to 60m horizontal curve. The project consists of Maximum span of 42 mt span and varied spans of 25mts and 30mts. Fish belly shaped PSC girders resting on aesthetic piers with open and pile foundations have been proposed.
Client : MVR Limited
Start of Project Date : May 2014
Services provided by Key Personnel: Detailed Design
CONSTRUCTION OF HLB OVER RIVER AMONA, GOA
Design of proposed high level bridge (HLB)across River Amona using 2 span continous 40 mt spans and twin cell PSC box girders. Overall length of bridge is 240m in very high curve.
Client : MVR Limited
Start of Project Date : May 2014
Services provided by Key Personnel: Detailed Design
CONSTRUCTION OF HLB OVER RIVER RIBANADAR, GOA
Design of proposed high level bridge (HLB) across River Ribandar using 4 x 25 mt spans with deck slab continuity and PSC I section girders. Overall span of the bridge is 200m.
Client : MVR Limited
Start of Project Date : September 2014
Services provided by Key Personnel: Detailed Design
CONSTRUCTION OF HLB OVER RIVER KRISHNA, TELANGANA
Design of proposed high level bridge(HLB)across River Krishna using PSC I section girders with proposed open and pile foundations. Overall length of the bridge is 1 kilometer.
Client : P.Narasimha Rao
Start of Project Date : September 2014
Development of Tikamgarh – Orcha Road on BOT (Annuity) Basis in Madhya Pradesh.
Scope of work includes design of 9.5 KM road including pavement design, fixing of alignment,
Design of 2 major river bridges across River Jamni and River Betwa, VUP’s and cluverts.
RUB at Malakpet Junction
Design of Malakpet RUB additional vents proposed on behalf of Hyderabad Metro Rail Limited (HMRL) . 2 Lane additional vent by box pushing method.
​
CONSTRUCTION OF FLYOVER AT KAPURBAWADI JUNCTION ,PUNE
Proof Checking of 2.4 kilometer flyover at Kapurbawadi Junction, Pune with proposed pre cast single cell PSC box girders of varied spans with highest span of 42mts with open and pile foundations. Construction of Ramps with Reinforced earth wall of maximum height of 8 mts.
Client : NCC Limited
Completion of Project Date : October 2014
Services provided by Key Personnel : Proof Checking
RIVER BRIDGE ACROSS KRISHNA RIVER.-ATKUR
Bridge across Krishna river near atkur to connect atkur village to kurvakula island in raichur dist.
Total length of bridge is 675 mts with 25 spans of 27 meter PSC girder supersturucture .
​
RIVER BRIDGE ACROSS KRISHNA RIVER.-DONGARAMPURA
Bridge across Krishna river near dongarampura in raichur dist. Under jurala Rehab project.
Total length of bridge is 286 mts with 11 spans of 26 meter PSC girder supersturucture .
ROB at Chaibasa – Kandra in Jharkand State.
Total length of the ROB is 1 km long including approaches consisting of 24 spans of PSC superstructure and 1 span of Steel composite ROB section.
Construction of R.O.B & RUB on Section IV Between BLGR – LOM Stations as part of the Proposed Ranchi bypass.
The Span arrangement for the ROB is 1 x 24.3 + 1 x 16.0 m. The Rob is in Skew of 52 deg, and rests on Pile foundations. The 24.3 m consists of 5 Nos PSC I Girders with in situ slab where as for the 16.0 m span , RCC deck slab is proposed.
5 Major Bridges at Gobindpur – Jamtara including Jamtara bypass (PACKAGE 1)
The project includes design of ROB’s, River Bridges and Road bridges for SEL-GKC (JV)
All the designs have been submitted and the project is under execution phase.
​
Construction of Approach bridge for Shree Singaji Thermal power plant Project, Newer Malwa, Madhya Pradesh
The total length of the bridge is about 544m. The Span arrangement of this bridge consists of 2 span continuous 32 m spans consists of Steel Girders with in-situ slab. The Superstructure rests on RCC rectangular piers. Pile foundations & Open foundations have been adopted for this bridge.
Major Bridge across Godavari river at Km 12/5 of Birpur to Kammunur Road in Karimnagar Dt. and to connect Adilabad Dt. at Kalimadugu of Jinnaram mandal, Karimnagar Dt.
The superstructure comprised of a simply supported cast-in-situ prestressed concrete twin-cell box girder with a span of 65m, 35m simply supported span consisting of 3 nos. PSC I girders with in-situ slab and all other are simply supported 24m spans consisting of 3 nos. of RCC Girders and cast in-situ deck slabs. The superstructure rests on RCC circular piers with open foundations.
​
Bridge for Conveyor System across Creek and Railway tracks for Vallur Thermal Power Plant at Ennore
The total length of the bridge is about 700m. The Span arrangement of this bridge is 1x16.42+2x19.1+2x19.0125+1x19.1+1x34.745+15x30.175+1x30.0875+2x30.0+1x40.3625m. The Superstructure consists of precast PSC I Girders with in situ slab and box girders. The Superstructure rests on RCC circular piers. Pile Foundations have been adopted for this bridge.
​
Construction of R.O.B in Pallavaram - Thuraipakkam Radial road connecting NH 45 in lieu of the originally proposed ROB at L/C No. 26 near Vaishnava College
Total length of R.O.B is 1.71 Km. Length of Ramps along radial road 449.65m, Length of ramp along NH 45 on left side is 601.5m and on right side is 598.9m and a curved length of ramp of rotary connecting left and right side ramps is 60.4m.
The Super structure arrangement of the ROB consist of two span (2 x 22.6) continuous single cell PSC cast in-situ box girder with curved and straight alignments. The foundation for piers is open foundations.
Construction of ROB at Visakhapatnam Port trust
We have carried out the part of work as sub consultants. Construction of additional link including roadwork and structures about 12.0 Km in Visakhapatnam Port area from junction on NH-5 to Visakhapatnam Port in Andhra Pradesh. This project involves 20 no. Spans between 30m to 45m. Superstructure consists of twin cell PSC box girders and 4 cell PSC box girders with curved and straight alignments.
Road Over Bridge at Hunter Road, Warangal, AP, India
This is a three-span bridge, across the railway line between Kazipet and Warangal Stations, consisting of two spans of 24.00 meters and one span of 31.00 meters. The superstructure comprised of a three-span continuous cast-in-situ prestressed concrete twin-cell box girder.
​
Road Over Bridge at Sanath nagar, Hyderabad, AP, India
This is a single-span bridge, across the railway line between Begumpet and Sanath nagar stations, consisting of a single span of 13.50 meters. The superstructure comprised of four numbers of prestressed precast concrete I-girders with a cast-in-situ RCC bridge deck.
​
Road Over Bridge at Eluru, AP, India
This is a four-span bridge, across the railway line between Eluru and Denduluru Stations, consisting of two spans of 24.50 meters, one span of 19.00 meters and one span of 14.00 meters. The superstructure comprised of a two-span continuous cast-in-situ prestressed concrete box girder for the 24.50 meter spans and cast-in-situ T-beam slab for the other two spans.
​
Road Over Bridge at Nuzvid, AP, India
This is a three-span bridge, across the railway line between Nuzvid and Vatluru Stations, consisting of one span of 34.00 meters, one span of 18.21 meters and one span of 12.60 meters. The superstructure comprised of a cast-in-situ prestressed concrete box girder for the 34.00 meter span and cast-in-situ T-beam girders for the other two spans.
20 bridges on National Highway No. 5 between Chennai and Nellore
The Project involves the preparation of bridge layouts, detailed designs, preparation of detailed drawings and Bill of quantities for various spans between 18.0 m to 30.0 m. The superstruture consists of
Precast PSC girders with RCC deck slab above / PSC Voided slabs / PSC box girders. The foundation consists of Open footings, pile foundations and well foundations. Two of the above are Road overbridges above existing railway tracks
Rail Over Bridge And Box Culverts For Paradip Refinery Project At Paradip
This Consists of 3 spans of 24.769 m -23.917 m – 21.187 m (in 23.70 Skew) with Pile Foundations. The Superstructure consists of 8 Nos Precast PSC Girders with 240 mm thk cast-in-situ RCC deck slab.The
three cell box culvert under the railway linehas a total length of 60.0 m out of which 10 m is a precast box culvurt pushed below the existing track using box pushing method and the rest is cast-in-situ.
Bridge Across River Hagari, Karnataka, India
This is a forty-span simply supported structure consisting of 25.00 meter spans. The superstructure comprised of precast prestressed concrete I-girders, launched with a launching girder. Foundations were of well foundation type.
Bridge Across River Bhima, Karnataka, India.
This is a twenty five-span simply supported bridge structure consisting of 25.00 meter spans. The superstructure comprised of precast prestressed concrete I-girders, launched with a launching girder. Foundations were of open foundation type.
​
Bridge Across River Kumaradhara, Karnataka, India for Gannon Dunkerly
This is a five-span simply supported bridge structure consisting of 40.00 meter spans. The superstructure comprised of precast prestressed concrete I-girders, launched with a launching girder. The substructure comprised of solid circular piers on well foundations.
​
Bridge Across Bandar Canal, AP, India
This is a three-span simply supported bridge structure consisting of 20.00 meter spans. The superstructure comprised of precast prestressed concrete I-girders, launched with a launching girder. Foundations were of well foundation type.
​
Bridge Across River Hemavathy, Karnataka, India
This is a thirteen-span simply supported bridge structure consisting of 25.00 meter spans. The superstructure comprised of precast prestressed concrete I-girders, launched with a launching girder. Foundations were of open foundation type.
​
Bridge Across River Manjira, Karnataka, India
This is a twenty six-span simply supported bridge structure consisting of 25.00 meter spans. The superstructure comprised of precast prestressed concrete I-girders, launched with a launching girder. Foundations were of well foundation type.

GHMC & Safety Certification

MORTH CERTIFIED