We have been making great strides in improving highway infrastructure in India, and our team has played a significant role in this progress over the past 40 years. Our roads and highway design service is tailored to meet all specifications and requirements.We are a one stop solution whether it comes to feasibility studies, topography,detailed designs and project reports for expressways and national/state highways.


NAGPUR MUMBAI EXPRESSWAY : PACKAGE 13
CONSTRUCTION OF ACCESS CONTROLLED NAGPUR - MUMBAI SUPER COMMUNICATION EXPRESSWAY (MAHARASHTRA SAMRUDDHI MAHAMARG)
FOR PACKAGE 13 FROM KM. 577+739 TO KM. 623+739.
Project scope involves Proof Checking of Highways and Structures for entire Package 13
Client : GVPR – BSCPL JV
Start of Project Date : JUNE 2019
Services provided by Key Personnel : Proof Checking
Salient Features:
1)Viaducts with Precast Prestressed Piers
2)Precast Prestressed Piercaps
3)Height of Piers ranging from 20m to 35m
AGRA TO LUCKNOW EXPRESSWAY : PACKAGE 3
Development of Agra-Lucknow access controlled expressway (Greenfield Project) in the state of Uttar Pradesh on Engineering, Procurement & Construction (EPC) basis. The Etawah (Village: Moonj) – Kannauj (Village: Nirmau) Road Section is a 67 km stretch. Project scope involves Proof Checking of
Proof Checking of major and minor bridges
Proof Checking of pedestrian & vehicular underpasses& culverts
Proof Checking of Highway Plan & Profile and Pavements design
Proof Checking of Ramps with Reinforced earth wall of maximum height of 8 mts.
Bill of Quantities & Detailed Estimations of quantities for various items
Client : NCC Limited
Start of Project Date : January 2015
Services provided by Key Personnel : Proof Checking.


ICCHAPURAM to NARASANAPETA 4 Lane
Capacity Augmentation of exsiting 4 lane stretch from Icchpuram to Narasanapeta from Km 470+415 to 580+700 (Design Length = 110.285 Km) of NH-16 (old NH-5) in the state of Andhra Pradesh on EPC mode.
Project scope involves Proof Checking of Highways and Structures for entire
Client : SPL Infra
Start of Project Date : March 2019
Scope of Work : Proof Checking
EMERGENCY LANDING FACILITY : NH-16
Development of Emergency landing facilities on National Highways in Chilakaluripet – Nellore Section of NH-16 from Km 1210.000 to Km 1215.000 in the State of Andhra Pradesh under Bharat Mala Project
Project scope involves Detailed Design of Highways and Structures
Client : MVR Projects Pvt. Ltd
Start of Project Date : JUNE 2019
Services provided by Key Personnel : Detailed Design
Salient Features:
1)Existing NH-16 (6 lane road) to be widened / re-aligned to suit emergency landing facility.

Four Laning of NH 52 from end of Biswanath Chariali by-pass (Km 208.00) to Gohpur (Km 265.50) (Total Length = 57.50 km)
Detailed Narrative Description of Project:
The NHIDCL is engaged in the development of highways and as part of this endeavour, the Authority has decided to undertake development of between Biswanath Chariali by-pass (Km 208.00) to Gohpur (Km 265.50) (Total Length = 57.50 km) in the state of Assam project on EPC basis. Ramky – T.K. (JV) as one of the perspective Concessionaire, has entrusted this project and Scope of Works
Detailed Description of Actual Services provided by our Company:
Widening of Existing 2 Lane Main carriageway to 4 lane divided Carriageway (57.5 km).
Construction of 7 Kms of new Service Road.
Construction of 4 nos. of MJBs, 4 nos of ROBs, 26 nos. of MNBs and 78 nos. CD works.


Experience Matters: A History of Achievements


MAJOR PROJECTS IN HIGHWAYS
Dhindi To Digamarru – Proof Checking
Rehabilitation and up-gradation of Dhindi – Digamarru section from Km 126/510 to Km 135/740 of NH-214 (New NH-216) and Digmarru – Losari section from Km 0/000 to Km 34/230 of NH- 214A (New NH-216) to two lane with paved shoulder in the state of Andhra Pradesh under NHDP –IV Through Engineering, Procurement & Construction (EPC) basis contract.
Gurajanapalli To Polekuru – Proof Checking
Rehabilitation and up-gradation of Gurajanapalli Village – Polekuru Village section from Km 41/161 to Km 59/800 of NH-214 (New NH-216) and Komargiri – Pasarlapudi section from Km 70/400 to Km 105/170 of NH-214 (New NH-216) to two lane with paved shoulder in the state of Andhra Pradesh.
Losari To Machavaram– Proof Checking
Rehabilitation and up-gradation of Losari – Machavaram section from Km 34/230 to Km 84/550 of NH-214 (New NH-216) to two lane with paved shoulder in the state of Andhra Pradesh.
KARASWADA TO PORVORIM– Proof Checking
Four laning ofNH-17 from existing km 502.500 to km 514.830 and km 517.880 to kllo.522.790 [Karaswada- Porvorim – Panaji- Bambolim sectionl in the State of Goa
VERNA MISSING LINK– Proof Checking
Construction of Missing Link - Four lane Highway along with paved shoulders from km. 11/680 to km. 14/020 and Up-gradation of existing stretch of 2 -lane highway to 4-lane from km. 14/020 to km. 15/520 with paved shoulder of NH-17B on Loutolim Village of Verna Industrial Estate of Salcete Taluka in Goa State on EPC mode
CANCONA NATIONAL HIGHWAY BYPASS – Proof Checking
Construction of Canacona National Highway Bypass from km. 68/00 [chainage 00/00) to km.85/740 (chainage 7/740) on NH-17(New NH-66) on P. M. Section in the State of Goa
​
Widening and Strengthening of Hazaribagh – Barkagaon – Tandwa – Khelari- Bijupara (SH-7) on EPC mode ( State Highway Authority of Jharkhand)
Construction of Widening, Strengthening and reconstruction of Hazaribagh – Barkagaon – Tandwa – Khelari- Bijupara (SH-7) including bridges and bypass in the state of Jharkhand on Engineering, Procurement & Construction (EPC) basis. The Road Section is a 115.65 km stretch. Project scope involves
Analyzing the Feasibility Report and Risk Assessment
Proof Checking of Highway Plan & Profile and Pavements design
Proof checking of Preliminary and Detailed Design of Bridges.
Proof checking of Detailed Design of underpasses and culverts.
Bill of Quantities verification.
Finalized Improvement Options
Client : M/s ECI ECC Ltd.
Start of Project Date : July 2015
Cost of Consultancy Work : Rs 75 lakh /- (Fifty lakh rupees only)
Services provided by Key Personnel : Proof cheking of complete analysis and design of pavement and highway according to IRC and IS code provisions.
AGRA TO LUCKNOW EXPRESSWAY : PACKAGE 3
Development of Agra-Lucknow access controlled expressway (Greenfield Project) in the state of Uttar Pradesh on Engineering, Procurement & Construction (EPC) basis. The Etawah (Village: Moonj) – Kannauj (Village: Nirmau) Road Section is a 67 km stretch. Project scope involves Proof Checking of
Proof Checking of major and minor bridges
Proof Checking of pedestrian & vehicular underpasses& culverts
Proof Checking of Highway Plan & Profile and Pavements design
Proof Checking of Ramps with Reinforced earth wall of maximum height of 8 mts.
Bill of Quantities & Detailed Estimations of quantities for various items
Client : NCC Limited
Start of Project Date : January 2015
Services provided by Key Personnel : Proof Checking.
.
​
CONSTRUCTION OF FLYOVER, VEHICULAR UNDERPASS / GRADE SEPARATOR AND PEDESTRIAN UNDERPASSES AT SWARGATE JUNCTION ,PUNE
A 2 kilometer flyover at Swargate Junction (Jedhe Chowk) Pune with proposed Cast in situ single cell PSC box girders of varied spans with a critical 2 x 55 mt curved span resting on open and pile foundations. Construction of approach Ramps using Reinforced earth wall of maximum height of 8 mts.
Client : NCC Limited
Start of Project Date : January 2014
Services provided by Key Personnel: Detailed Design
Bridge Across River Shimsha, Karnataka, India
This is a twelve-span simply supported bridge structure consisting of 25.00 meter spans. The superstructure comprised of precast prestressed concrete I-girders, launched with a launching girder. Foundations were of open foundation type.
​